On average, building the G15 or 2.0 (2 foot robot) should take approx. 3-6 hours, whereas building the G15KS or 2.0XL (4 foot robot) will take about 4-8 hours. For additional help on how to build our Meccanoid, check out our how-to videos of the build process for your Meccanoid G15 and Meccanoid G15KS here www.meccano.com/videos. |
I'm having trouble with my build. How long should this take?
Last Updated: 2188d